In the injection molding process, the period of filling cold runner (if it exists) and cavity is called injection time (purple line in time pressure diagram below).
A slow injection time has the advantage to have less shear and gentler treated material.
However, too low injection times lead to pressure increase or incomplete part filling.

Injection Time in Plastic Industry


Injection Molding Process: The injection time is the time needed to reach 100 % of part filling.



Related topic:

This glossary of plastic industry is provided by PLEXPERT Canada Inc.
Password Strength Very Weak
FORGOT PASSWORD ?
Lost your password? Please enter your username or email address. You will receive a link to create a new password via email.
We do not share your personal details with anyone.